I’ve drawn a new detail view for the front windows and awning, to help plan their construction:
I’ve also tweaked the existing plans for the cat shelter a little bit, based on changes while building. Nothing too significant, but I thought I’d publish the changes for completeness.
There are only a couple of subtle differences in the front elevation: the deck is higher than previously pictured, and the feeder opening is taller:
You can see those changes in this elevation, too:
Here you can see the higher deck, and its supports:
I originally planned to have the deck lower than the floor, to allow clearance for the maintenance door swing. But I also wanted to extend the side rim joists from the back of the shelter to the front of the deck, to make it more sturdy. I considered having the side joists higher than the deck level, but felt that’d look untidy. I’m happy with how it turned out. I’ll just have the maintenance door a bit higher to offset that change.